Factory & Quality

Precision Behind Beauty

Not a factory tour — a craft story. Five controlled stages, one quality system, and people who sign their work.

The Atelier

A Workshop Built
Around One Standard

Our 24,000 m² facility houses the R&D centre, tool room, injection hall, assembly lines and decoration workshop under a single quality system. Nothing is subcontracted without our own inspection report.

Every project is assigned a technical lead who follows it from the first sketch to the last pallet — the person who answers your email is the person who validates your samples.

Request An Audit Visit
Electroplated Champagne · Laser Signature
Five Stages

How Your Package Is Made

Packaging development studio with sketches, colour chips and aluminium components 01 — R&D Centre

Research & Development

Material compatibility lab, formula-contact testing and a library of more than 200 proprietary constructions. New mechanism concepts are validated here before they ever reach a customer presentation.

Mould store and fitting benches in the in-house tool room 02 — Mould Development

Tool Room

In-house mould design and CNC, EDM and wire-cutting capability. Tool steel is selected per project lifetime, with mould-flow simulation before the first cut.

Injection moulding machine with robotic take-out arm on the moulding floor 03 — Injection Moulding

Moulding Hall

52 machines from 60 to 380 tonnes, with closed-loop regrind and clean-room zones for transparent and light-colour parts.

Operators at the spray and decoration line in cleanroom garments 04 — Assembly & Decoration

Assembly Lines

Semi-automatic and fully automatic lines for mechanism assembly, plus hot stamping, UV printing, laser and electroplating cells — all inline inspected.

05 — Quality Control

Nothing Ships
On Assumptions

Incoming resin, first-piece, patrol and final inspections are recorded per batch. Every shipment carries a report you can audit.

  • Dimensional report on T1 and per production batch
  • Closure torque and cycle testing (500 cycles)
  • Drop test from 1 m on concrete, 6 orientations
  • Colour ΔE ≤ 1.0 against approved master
  • Formula compatibility and migration test at 40 °C / 75% RH
  • AQL 2.5 final release with photographic record
Inside The Atelier

The Floor, As It Runs

Unretouched photographs from our moulding hall, tool room, decoration line and finished-goods warehouse. Click any frame to enlarge.

By The Numbers

Capacity You Can Plan Around

0Years Experience
0Packaging Designs
0Units Annual Capacity
0Global Beauty Partners
ISO 9001Quality Management
ISO 14001Environmental Management
REACH / FDAMaterial Compliance
Visit Or Audit

See The Atelier Yourself

We host brand audits, virtual factory tours and sampling workshops. Book a session with our technical team.

Book A Visit